About us
To be a first-class water environment comprehensive regulation expert
South China River lake chief training
Close advisor to government and partners
Product service
South China first, the country's leading water environment comprehensive regulation service provider
Successful case
We are committed to the comprehensive improvement of water environment and the construction of a beautiful China
Information center
Clear water and green mountains are gold hills and silver mountains
Talent development
On character love learning have dreams rich passion heavy team
Contact us
Honesty, win-win, pragmatic and progressive collaborative innovation
River sludge resource utilization
Current Location:首页 > Successful case list > River sludge resource utilization
Jiangsu Nantong Rudong County "three rivers and six banks" river regulation project
Brief introduction of case
Zero sludge transport, zero sewage discharge, zero environmental pollution。

Resources and environmental protection has an efficient service team to provide comprehensive and comprehensive services, from the early stage of investigation, to project review and approval, specific implementation and operation, as well as project acceptance and settlement, until equipment removal and transportation, better control of project costs and progress。
Case details

Project profile description

The project is located in Digangang Town, Rudong County, Jiangsu Province. Due to the long-term pollution of some river channels in recent years, a large number of pollutants such as garbage and silt have been deposited at the bottom of the river bed, which have long-term impact on the water quality of the river channels and caused serious harm to the surrounding environment。


Resources and environmental protection The use of domestic leading technology, equipment and the formation of systematic solutions, so that the original only abandoned river silt to meet the green soil standards, and the public river with heavy metal pollution of silt reuse, making the original about 37.90,000 m3 of silt turned waste into treasure, in the form of internal digestion of the project, not only solved the problem of difficult disposal of waste and shortage of backfill earthwork in the project construction, but also saved the disposal cost, and realized harmless, reduced and resource utilization of silt, taking into account economic, environmental and social benefits。


Solution Overview

The scope of this project is the Rutai Canal, Digo River, Digan River city section along the river and some tributaries, the total length of the river is 15.05km, the total silt removal capacity is 37.90,000 m³。The project has set up two silt solidification plants to facilitate the treatment and disposal of river silt after solidification。


This project needs to treat about 8280m3/d of residual water, and two integrated water treatment equipment, each with a scale of 5000 tons/day, adopts the "micro-flocculation + micro-filtration" process to treat residual water。Process principle: After the sewage enters the catchment basin, it is lifted from the lifting pump to the integrated facility for quality purification, which goes through the coagulation and precipitation process in turn, and the micro-filtration clarification process. Under the action of coagulants and flocculants, large suspended particles are rapidly precipitated, and the clarified effluent is discharged up to standard。Among them, the large particle flocculent enters the original sludge thickening tank for concentration and dehydration, and the volume is reduced and transported to the sludge treatment station for centralized treatment and disposal。

Relevant case
Scan the QR code,
Pay attention to resources and environmental protection technology official wechat
Copyright 2018 © Guangzhou Resources Environmental Protection Technology Co., LTD. All Rights reserved Guangdong ICP 13084221 Powered by vancheer